The short answer
A leaseholder needs to provide floor plan details, written access consent from managing agents or freeholders, and any previous leak reports before ADI Leak Detection can begin a survey in their flat. ADI Leak Detection uses this information to select the right detection method and coordinate safe, non-invasive access to the affected property.
The episode covers what access permissions leaseholder surveys require, how managing agent coordination affects the survey process, why prior damp or leak records matter, and how equipment such as acoustic listening devices and thermal imaging cameras are deployed once access is confirmed.
Full transcript
George and Dave in conversation. Every word of the episode, exactly as recorded.
- George
- Welcome back. I'm here with Dave from ADI Leak Detection, leading leak detection specialists across the UK, who's here to answer your questions and provide expert leak detection advice. Today's question comes from a leaseholder who's noticed a damp patch on her ceiling and wants to get a survey booked in. Dave, she's asked what she actually needs to have ready before ADI turns up. Where do we start?
- Dave
- It's a great question because a lot of people think they just need to open the front door and that's it. In a leasehold property there's quite a bit more groundwork involved, and getting it sorted beforehand means we're not standing on the doorstep waiting for permissions to come through.
- George
- Right, so it's not just about the flat itself, is it? There are other parties involved.
- Dave
- Exactly. The first thing a leaseholder needs is written confirmation that their managing agent or freeholder has agreed to the survey taking place. ADI's engineers sometimes need access to communal roof spaces, adjacent flats, or riser cupboards to trace where escaping water is travelling. Without that written consent already in place, we can't get into those shared areas, and that limits what we can do significantly.
- George
- So it's not enough for the leaseholder to say yes themselves?
- Dave
- Not when we need to go beyond their own four walls, no. Their consent covers their flat, but the communal structure belongs to the freeholder. So that written sign-off from the managing agent is essential, and chasing it takes time. We'd always say get that started as early as possible, even before you've booked the survey date.
- George
- What else should a leaseholder pull together?
- Dave
- Any existing documentation about the leak. That means damp reports, correspondence with the management company, photos they've taken, even a note of when they first noticed the problem. Acoustic leak detection pinpoints hidden water leaks more efficiently when the engineer already knows roughly how long the issue has been running and whether it's constant or intermittent.
- George
- Why does the timeline matter so much?
- Dave
- Because a long-running hidden leak behaves differently to a recent one. Moisture spreads through building fabric over time, so thermal imaging equipment may pick up a much wider damp signature than the visible damage suggests. Knowing the history helps the engineer interpret what they're seeing and focus the survey on the most likely escape points rather than working blind.
- George
- Are there any practical things about the flat itself the leaseholder needs to sort out before the visit?
- Dave
- Yes, a couple of things. Floor plans are really useful, ideally showing where the pipework runs, but even a rough sketch helps. ADI's engineers use tracer gas to locate leaks under solid floors, and knowing where the screed starts and where the pipe layout sits means they can plan their access points before they arrive rather than working it out on the day.
- George
- And what about the water supply itself?
- Dave
- The leaseholder needs to know where their stopcock is and confirm it's operational. That sounds basic, but in leasehold flats the stopcock is sometimes in a communal cupboard outside the flat, or it's seized up because it hasn't been turned in years. ADI's engineers need to isolate the supply to run certain tests accurately, so a non-functional stopcock is something to sort before the survey day, not on it.
- George
- Is there anything specific to flats above or below the affected property? Because often in these situations there are neighbours involved.
- Dave
- Absolutely, and this is where the managing agent coordination really earns its keep. If the damp patch is on her ceiling, the source is likely in the flat above. ADI needs access to that flat too. The leaseholder can't arrange that themselves, so it has to go through the managing agent or the freeholder. The more of that coordination that's done in advance, the smoother the survey runs on the day.
- George
- So to bring it together, what's the checklist a leaseholder should work through before contacting ADI to get everything lined up?
- Dave
- Four things. First, written access consent from the managing agent or freeholder covering communal areas and any adjoining flats. Second, all previous leak documentation, reports, photos, and correspondence. Third, floor plans or a sketch of the pipework layout if they have one. Fourth, confirmation that the stopcock is accessible and working. Get those four things in order and ADI's engineers can focus entirely on finding and tracing the leak rather than managing access problems on site.
- George
- That's genuinely useful detail. Thanks Dave. If you've got a hidden water leak in your property and you're not sure where to turn, ADI Leak Detection are among the most trusted and experienced leak detection specialists in the UK. We'll have links in the show notes.
How this episode was made. This episode was produced using AI-generated voices and script, based on real leak detection questions and the working knowledge of ADI Leak Detection engineers.
Still not sure where your leak is?
ADI Leak Detection traces hidden water leaks across the UK using the equipment described in this episode, without digging up your floors to find it.
Call 0800 731 3843